Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # : 035 <br />Date : 0311712010 <br />User: JRS <br />State : Colorado <br />County : Fremont <br />Site Northfield Mine <br />Permit/job# : C- 2006 -085 <br />Abbreviation : none <br />Filename : C085 -035 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 1 <br />Task description: Regrade Pond 1 <br />HOURLY EQUIPMENT COST <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 342.69 LCY /hr <br />Adjusted fleet production : 342.69 LCY /hr <br />Fleet size : <br />Basic machine Cat D8R Series 11 - 8SU (200: <br />Horsepower: <br />310 <br />7.82 Hours <br />Blade type Semi - Universal <br />$0.475 <br />/LCY <br />Total job cost: <br />Attachment no. 1 : ROPS Cab <br />Shift basis: <br />1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : $53.74 <br />NA <br />Operating cost/hour : $70.63 <br />100 <br />Ripper op. cost/hour : $0.00 <br />0 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : <br />$162.90 <br />MATERIAL QUANTITIES <br />Initial <br />Swell Loose <br />volume: 2,300 CCY factor : 1.165 volume: <br />2,680 <br />LCY <br />Source of estimated <br />volume Exhibit V <br />_ <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : <br />75 feet <br />Material consistency: <br />0.90 <br />(Cat HB) <br />Unadjusted hourly production : <br />1 LCY /hr <br />Dozing method : <br />1.00 <br />(gen.) <br />Visibility : <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shift1day) <br />Compacted fill or embankment <br />Spoil pile: <br />0.80 <br />(fad-ro <br />Push gradient: <br />0.95 <br />(Cat HB) <br />Average push gradient : <br />3.00 % (pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : <br />5,400 feet <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: <br />2,900 Ibs /LCY <br />Net correction : <br />0.34 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 342.69 LCY /hr <br />Adjusted fleet production : 342.69 LCY /hr <br />Fleet size : <br />1 <br />Dozer(s) <br />Total job time : <br />7.82 Hours <br />Unit cost : <br />$0.475 <br />/LCY <br />Total job cost: <br />$1,274 <br />