My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />6.42 <br />COMPACTION WORK <br />Average compactor speed (S) : <br />PROJECT IDENTIFICATION <br />mph <br />Task # : 008 State : Colorado Permit/job # : C- 2006 -085 <br />8.00 <br />Date : 17- Mar -2010 County : Fremont Abbreviation : none <br />Conversion constant (C) : <br />User: JRS Site : Northfield Mine Filename : C085 -008 <br />(5,280 ft./12 in. /27 cu.ft.) <br />Required number of machine passes (P) : <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />passes <br />Permit or other job action : Technical Revision 1 <br />627.88 <br />Task description Compact Mine Waste and Coal Stockpile Footprints at Mine Waste Pile <br />HOURLY EQUIPME� NT COST <br />Machine description CAT 815F Horsepower: <br />240 <br />Compactor type : Soil - tamping foot Shift basis: <br />1 per day <br />Utilization % Data source: <br />(CRG) <br />Cost Breakdown: Ownership cost/hour : $44.16 <br />NA <br />Operating cost/hour : $78.47 <br />100 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $161.17 Total fleet cost/hour : <br />$161.17 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume: 15,000 LCY factor : 0.900 volume: 13,500 <br />CCY <br />Source of estimated volume : Division Estimate <br />Source of estimated shrinkage factor : CAT Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />6.42 <br />feet <br />Average compactor speed (S) : <br />3.00 <br />mph <br />Compacted thickness of each lift (L) : <br />8.00 <br />inches <br />Conversion constant (C) : <br />16.3 <br />(5,280 ft./12 in. /27 cu.ft.) <br />Required number of machine passes (P) : <br />4 <br />passes <br />Unadjusted hourly unit production : <br />627.88 <br />CCY /hr <br />Job Condition Correction Factors Source <br />Site altitude : 5,400 feet Altitude adjustment factor: 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production : 521.14 CCY /hr <br />Adjusted hourly fleet production : 521.14 CCY /hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time: 25.90 hours <br />Unit cost : $0.309 per CCY Total job cost: $4,175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.