Laserfiche WebLink
CIRCES Cost Estimating Software <br />pounds /LCY <br />SCRAPER - ONLY WORK <br />14.00 <br />PROJECT IDENTIFICATION <br />Material description : <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Heaped volume: <br />Task # : 006 State : Colorado Permit/job # C- 2006 -085 <br />LCY <br />Date : 0311712010 County : Fremont Abbreviation : none <br />4.0 <br />User : JRS Site : Northfield Mine Filename : C085 -006 <br />17.50 <br />LCY <br />Permit or other job action : Technical Revision 1 <br />pounds <br />Task description Haul Footprint of Raw Coal Stockpile to Waste Fill Pile <br />-2.0 <br />4.0 <br />HOURLY EQUIPMENT COST <br />LCY <br />Model Cat 621G Shift basis : <br />1 per day <br />Cost Breakdown: Job utilization % Horsepower : <br />365 <br />Ownership cost/hour : $55.14 NA Weight (UST) : <br />35.55 <br />Operating cost/hour : $79.09 100 Cost data source : <br />(CRG) <br />Operator cost/hour : $24.98 NA <br />Maneuver and spreading time: <br />Total unit cost/hour : $159.21 Total fleet cost/hour : $159.21 <br />minutes <br />MATERIAL QUANTITIES <br />• loading time per pair on push -pull models <br />Initial Swell Loose <br />Total job time: <br />volume: 600 CCY factor : 1.125 volume : 675 <br />LCY <br />Source of quantity take -off : Map 12, Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTIO <br />N <br />Haulinq Capacity: <br />Srranw Pavloa (weight) Basis : I Scraper Bowl (volume) Basis: <br />Material weight : 2,350 <br />pounds /LCY <br />Struck volume: <br />14.00 <br />LCY <br />Material description : <br />Travel time (min.) <br />Heaped volume: <br />21.00 <br />LCY <br />USER - PROVIDED WEIGHT DATA <br />4.0 <br />Average volume: <br />17.50 <br />LCY <br />Rated payload: 48,000 <br />pounds <br />700 <br />-2.0 <br />4.0 <br />Payload capacity: 20.43 <br />LCY <br />Adjusted capacity : <br />17.50 <br />LCY * ** <br />Adjusted fleet production : <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />2.00 <br />minutes <br />Maneuver and spreading time: <br />0.70 <br />minutes <br />Travel time: <br />• loading time per pair on push -pull models <br />Fleet size : 1 Scraper(s) <br />Total job time: <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />minutes <br />Haul : <br />700 <br />2.0 <br />4.0 <br />6.0 <br />1,204 <br />0.65 <br />Iminutes ** <br />Return: <br />700 <br />-2.0 <br />4.0 <br />2.0 <br />2,898 <br />0.24 <br />Iminutes ** <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time <br />3.60 <br />minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,400 <br />Adjusted Hourly Production ; <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Unadjusted unit production : <br />292.05 <br />LCY /Hour * ** <br />Job efficiency factor: 0.83 (1 shift/day) <br />Adjusted unit production : <br />242.40 <br />LCY /Hour <br />Adjusted fleet production : <br />242.40 <br />LCY /Hour <br />Net job correction factor: 0.83 <br />w <br />"' 2 times volume on push -pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) <br />Total job time: <br />2.78 <br />Hours <br />Unit cost : $0.657 /LCY <br />Total job cost : <br />$443 <br />l <br />