exception of the south clean water diversion ditch, are temporary and <br />will be reclaimed by the end of the reclamation liability period. The <br />schedule of ditch removal will depend on the time required to <br />successfully establish vegetation and any unforeseen needs to control <br />erosion on reclaimed areas. <br />Topsoil <br />Topsoil material will be recovered from all proposed mine disturbance <br />areas and stockpiled for use during reclamation activities. Topsoil <br />storage practices were previously discussed in this section under <br />Topsoil Stockpiles. The proposed topsoil handling procedures discussed <br />in this section apply to the main mine facility area, adjacent roads, and <br />the ventilation shaft areas. <br />Areas to be disturbed for the proposed mine facilities encompass <br />gently sloping terrain within the bottom of the valley formed by <br />Chandler Creek. These areas have not, for the most part, been <br />previously disturbed. Previously disturbed areas that exist in and <br />adjacent to planned facility areas include an abandoned railroad bed <br />immediately adjacent to the south bank of Chandler Creek, a ranch <br />road adjacent to the north and west sides of the main facility area, a <br />small abandoned irrigation ditch parallel to and along the west side of <br />the ranch road, and the right -of -way corridor for County Road 79. <br />These previously disturbed areas are depicted on Map 12. <br />Northfield conducted soil sampling activities in the planned facility area <br />in order to determine the horizons suitable for salvage. A discussion of <br />the description, sampling, and analysis of soil horizons for the area is <br />presented in Section 2.04.9, Soils Resources Information. Based on <br />the field sampling results, Northfield has determined that suitable <br />topsoil materials can be recovered to a depth averaging ten (10) <br />inches in the proposed facilities and ancillary areas. Areas subject to <br />topsoil removal include the main facilities area, haul road, ventilation <br />shaft sites and access road, and north light use road. The estimated <br />area of surface disturbance for these areas, and associated volume of <br />recoverable topsoil, is provided in Section 2.05.4 of the permit <br />application. <br />Northfield plans to place all topsoil in two topsoil stockpiles constructed <br />adjacent to the facilities and ventilation shaft areas during the initial <br />construction of these sites. Following initial construction of this and any <br />other topsoil stockpiles, Northfield will install appropriate topsoil <br />marker signs identifying the topsoil materials in accordance with Rule <br />4.02. All proposed stockpile locations are shown on Map 12. <br />2.05.3 -27 Revised 12/04/09, TR -01 <br />