Laserfiche WebLink
I <br />• 11) THENCE N 90 ° 00'00" E A DISTANCE OF 2025.93' TO INTERSECT <br />THE NORTH -SOUTH CENTERLINE OF SAID SECTION 12; <br />12) THENCE S 0 0 23'38" E ON THE NORTH -SOUTH CENTERLINE OF <br />SAID SECTION 12 A DISTANCE OF 620.43' TO INTERSECT THE SOUTH <br />LINE OF SAID SECTION 12; <br />13) THENCE S 0 0 16'30" E ON THE NORTH -SOUTH CENTERLINE OF <br />SAID. SECTION 13 A DISTANCE OF 2653.63' TO THE CENTER OF SAID <br />SECTION 13; <br />14) THENCE S 0 0 16'30" E ON THE NORTH -SOUTH CENTERLINE OF <br />SAID SECTION 13 A DISTANCE OF 1319.00 THE NORTHWEST <br />CORNER Of= THE SOUTHWEST 1 /40F THE SOUTHEAST 1 /40F SAID <br />SECTION 13; <br />15) THENCE S 44 0 20'52" W A DISTANCE OF 3768.40' TO INTERSECT <br />THE WEST LINE OF SAID SECTION 24; <br />• <br />16) <br />THENCE S 77 0 18'14" <br />W A DISTANCE OF 1391.38; <br />17) <br />THENCE S 57 ° 27'26" <br />W A DISTANCE OF 1267.90'; <br />18) THENCE N 70 ° 54'50" W A DISTANCE OF 2999.78' TO INTERSECT <br />THE WEST 'LINE OF SAID SECTION 23; <br />19) THENCE N 70 ° 54'50" W A DISTANCE OF 704.15'; <br />20) THENCE N 0 ° 32'10" W A DISTANCE OF 1342.66' TO INTERSECT <br />THE NORTH LINE OF SAID SECTION 22; <br />21) THENCE N 86 ° 47'17" E ON THE NORTH LINE OF SAID SECTION 22 <br />A DISTANCE OF 654.47' TO THE POINT OF BEGINNING; <br />Containing 1174 acres, more or less. <br />The following is a description of the documents upon which Northfield <br />bases its legal right to enter those lands within the permit area for the <br />purpose of conducting coal mining operations. <br />• The permit boundary of the mine site is situated within the lands <br />described in the following legal. documents. <br />A. Lease Agreements between Northfield Partners LLC and mineral <br />2.03 -9 Revised 2/22/2008 <br />