• 1.2.5 Cultural Practices <br />In addition to 2009 replaced topsoil revegetation practices, Trapper also conducted several <br />other cultural practices. These practices are addressed below. <br />Mature Shrub Transplant Clumps <br />In 2009, no new shrub clumps were constructed. At least one new shrub clump is planned for <br />construction in the fall of 2010. <br />Drainage Reconstruction <br />Refer to Section 3.0 of this annual report. <br />Contour Ditch Construction <br />During 2009, Trapper constructed contour ditches in reclaimed areas of Flintlock Pit (Map 1). <br />Stock Tank Construction <br />No new Stock Tanks were constructed during the 2009 field season. Refer to Section 6. <br />Stock Tank Reclamation <br />No Stock Tanks were reclaimed during the 2009 field season. Refer to Section 6. <br />is Developmental Drill Sites <br />During the 2009 Developmental Drilling season 22 holes were completed. Of these holes, 21 <br />developmental drill sites were disturbed that required regrading and seeding. All other <br />development drill sites are included within pit advancement disturbance by the end of 2010. <br />Regraded holes were primarily located in the eastern portion of the mine although two holes <br />were drilled in the northwest portion of the mine. <br />Topsoil Piles <br />Refer to Section 5. Topsoil stockpiles were sloped and seeded to the approved 2009 <br />perennial topsoil pile mix. Approximately 8.7 acres were treated. <br />Sediment Dams <br />Middle Flume #3 Pond was cleaned starting in late 2009 and finishing in early 2010. No other <br />major structures were cleaned in 2009. <br />1.2.6 Previously Revegetated Acres <br />The locations and acres for all previously revegetated areas, seeded to perennial species, are <br />presented in Map(s) 1. To date, Trapper has revegetated approximately 3,515.4 acres (40.9 <br />acres in 2009) within the boundaries of active mining and has revegetated an additional 516.0 <br />acres within the permit boundary but outside topsoil stripping limits. Of the total revegetated <br />acres, 2,919.6 reclaimed acres have received final phase III bond release. <br />• Not shown on Map(s) 1 in this annual report are the areas seeded to temporary perennial <br />mixes that will require final reclamation prior to the end of the project (life of mine). <br />FVUBDN/GCR 3/10 <br />[DRW09RECte )d1 -0j <br />