My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-13_PERMIT FILE - C1981018 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2002-05-13_PERMIT FILE - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:38 PM
Creation date
6/15/2010 4:40:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Doc Name
Please Refer to Illustration 46 for Water Discharge Permit
Section_Exhibit Name
Illustration 13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~3 ge 4a Of 19 <br />Permit No .: CO-0038024 <br />A. TERMS P1'D CONDITIONS (Continued) <br />8. Monitoring Requirement for Outfall 023 <br />In order to obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified in Section A, <br />the permittee shall monitor all effluent parameters at the following <br />frequencies: <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br /> <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Oil and Grease, mg/1 f/ <br />~ Weekly Visual/Grab <br />pH, s. u. Weekly Grab <br />Total Dissolved Solids, mg/1 g/ Quarterly h/ Grab <br /> Reporting of the above data shall be on a quarterly basis. Refer to <br /> Part I. D.2 for specific requirements. <br />Sampling by the permittee for compliance with the monitoring <br />requirements specified above shall be performed at the following <br />location(s): The pump outfall at the east intake, as shown in figure 5. <br />Monitoring by the Division for the purpose of compliance and/or <br />enforcement of the effluent limitations shall be performed as per <br />"Sample Type" specified above. <br />9. Sal±~tt•, Stud•. <br />The permittee shall perform a study to determine the feasibility of <br />achieving a no-salt discharge from all outfalls, or if not practical, <br />then achieving discharge of less than one ton per day of TDS. This <br />SL.:"~' ~ .,. = ^9 ^P^ ^f ~ i;+ err -~_ _. - .- L-." ..- v__~ -_. <br />_. ___ __..__.._ ._ _•Jno _ <br />•-°'i _~ :..__1L ._OPra G. aP.Q SCa11 Je SLI ~11;11C U'~i, :: i.C =7 .~ ~.-. -'--- '~n <br />~,r:cC tlVe CaLO OI A~erdrent i~0. J. <br />See Part I.A.9. for Footnotes. <br />• Amended 06/18/85 <br />Amended 02/25/86 <br />Amended dl ,~(,/Q~ <br />Cade: i - 4 Date: 1 - 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.