Laserfiche WebLink
SEDCAD 4 for Windows <br />(:nn.irinhf iam _ , >nn7 13-1. 1 Crh—.h <br />1 <br />DP -1 Pom <br />10- yr /24 -hr <br />2008 Overhaul of Primary Riser model <br />with 2" weep hole <br />Screening run to demonstrate that an 17,5" slipline (as- built) of <br />the primary discharge spillway culvert through the <br />embankment will still pass the design storms. The riser was <br />reduced to 24 "steel pipe and the 2" weep hole was added to <br />the model, <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970 - 675 -4322 <br />Email: sanstedt @yahoo.com <br />• <br />Filename: DP -1 2008 Overhaul slip liner in outlet w sedimentology- 10yr.sc4 Printed 10 -08 -2009 <br />