Laserfiche WebLink
SEDCAD 4 for Windows <br />P--;-M loon _Onn7 0-1n 1 C..h...eh <br />1 <br />• <br />DP -1 Pond 25-vr/24-hr <br />2008 Overhaul of Primary Riser model <br />with 2" wee a hole <br />Screening run to demonstrate that an 1 Z 5" slipline (as- built) of <br />the primary discharge spillway culvert through the embankment <br />• will still pass the design storms. The riser was reduced to 24" <br />steel pipe and the 2" weep hole was added to the model, <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970 - 675 -4322 <br />Email: sanstedt@yahoo.com <br />• <br />Filename: DP -1 2008 Overhaul slip liner in outlet - weep hole - 25yr.sc4 Printed 10 -06 -2009 <br />