Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #8 <br />Inspection Period: Second Quarter 2010 <br />Inspection Date: 04/30110 <br />General Description or Reference to Site Plan: <br />This pond lies north of Highway 12 at the base of the refuse disposal area. The pond receives <br />run-off from the refuse disposal area. <br />EMBANKMENT <br /> <br />1). Adequacy of the vegetative cover. xcellen Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some - ew None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No <br /> At the principal spillway inlet? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes.. No - <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br /> Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes f? No <br />Yes I? <br />Yes ?- <br />Yes <br />Just starting . None <br />No <br />No <br />No ?l