Laserfiche WebLink
It is from these alternative sources of water that the surface water augmentation plan has been <br /> developed. No ground water impacts requiring mitigation are forecast. However, should a ground <br /> water supply be diminished to such an extent that it precludes its use, Western Fuels will replace this <br /> supply with surface water available to them (only 62.1 of the 114.5 acre-feet of CCC water is <br /> required for the surface water augmentation plan) or WFC will redrill a new well. <br /> The monitoring plan is described in Part It, Section B, Item II.C., of this Findings Document. The <br /> plan is detailed enough to show any impacts on adjacent water rights to the New Horizon Mine sites. <br /> Western Fuels-Colorado has shown that it has adequate water rights to mitigate any discovered <br /> impacts and this complies with the requirements of 4.05.15. <br /> 11 <br />