Laserfiche WebLink
RIDER TO MINING PERMIT <br /> Permit Date: May 26, 1988 <br /> Permit No: C-81 -008 <br /> The following additional stipulations and conditions form an integral part of <br /> the foregoing permit: <br /> Stipulation No. 03 <br /> PEABODY COAL COMPANY WILL INSTALL CONTINUOUS FLOW MONITORING DEVICES AT <br /> THE UPSTREAM PERMIT BOUNDARY AND DOWNSTREAM PERMIT BOUNDARY OF THE <br /> LOWER SECOND PARK IRRIGATION DITCH. THESE DEVICES SHALL BE INSTALLED <br /> AS SOON AS POSSIBLE BUT NO LATER THAN AUGUST 1 , 1988. WATER QUALITY <br /> SAMPLING SHALL COMMENCE SIMULTANEOUS WITH THE INSTALLATION OF THE <br /> CONTINUOUS FLOW MONITORING DEVICES AND SHALL BE SAMPLED AT THE SAME <br /> FREQUENCY AND FOR THE SAME CONSTITUENTS AS THE OTHER SURFACE WATER <br /> MONITORING SITES OF THE NUCLA MINE: RESULTS OF THIS MONITORING WILL BE <br /> INCORPORATED INTO THE ANNUAL HYDROLOGY REPORT. THE DIVISION WILL <br /> ENTERTAIN DISCONTINUATION OF THIS MONITORING AFTER A MINIMUM OF TWO <br /> YEARS OF MONITORING IF THERE IS NOT A WIDE FLUCTUATION IN DATA RESULTS <br /> FROM ONE YEAR TO THE NEXT. <br /> ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br /> COLORADO DEPARTMENT OF <br /> NATURAL RESOURCES <br /> President, Western Division <br /> By ti. ,.' abody Coal Company <br /> Aerator it le <br /> tsto <br /> AG Alpha No: NR LR TYB <br /> AG File No. PNR/3928/JD <br />