Laserfiche WebLink
1* 2.05.3 <br />8. Stoker Collecting Convenor <br />The collecting conveyor transfers coal from the screen and crusher building to the <br />36 -inch radial stacker. This 36 -inch wide conveyor is approximately 29 -feet long. <br />9. Transfer Conveyor <br />The transfer conveyor transports coal from the crushing and screening building to <br />the to the downhill conveyor transfer building. This partially covered 920 -foot long <br />48 -inch wide belt is constructed on grade except for the last 120 -feet which is truss <br />mounted to support its entrance to the transfer building. <br />10. Downhill Conveyor <br />The downhill conveyor transports coal from the downhill conveyor transfer building to <br />the stacking tubes located at the highway stockpile area. This 2,755 -foot long 48- <br />inch wide bell is constructed on grade except for the last 475 -feet which is truss <br />mounted to support its elevation to the top of the coal stacking tubes. The on grade <br />section is partially covered. The truss mounted section will be partially covered and <br />will have a dribble pan. <br />11. Reclaim Loadout Conveyor <br />The reclaim tunnel conveyor transports coal from the highway stockpile to the <br />transfer building. The 340 -foot long section of this 60 -inch wide belt is mounted on <br />grade in the reclaim tunnel. Where the belt exits the reclaim tunnel, the conveyor is <br />truss mounted and partially enclosed for another 340 -feet where it enters the transfer <br />building. <br />12. Loadout Conveyor <br />The loadout conveyor transports coal form the transfer building to the batch weigh <br />loadout. This 1,000 foot long 60 -inch wide belt is truss mounted and totally <br />enclosed. <br />13. Reclaim Wash Plant Feed <br />The reclaim tunnel conveyor transports coal from the highway stockpile to the wash <br />plant transfer building. A 175 -foot long section of this 36 -inch wide belt is mounted <br />on grade in the reclaim tunnel. Where the belt exits the reclaim tunnel, the conveyor <br />is truss mounted and partially enclosed for another 75 -feet where it enters the <br />transfer building. <br />14. Plant Feed Conveyor <br />The plant feed conveyor transports coal form the wash plant transfer building to the <br />wash plant. This 300 foot long 36 -inch wide belt is truss mounted and partially <br />enclosed. <br />MR-60 <br />2.05-18- 07/05 <br />1) PPPOK.b <br />2/17/0-S <br />