My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_PERMIT FILE - C1996083A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-16_PERMIT FILE - C1996083A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:12 PM
Creation date
6/9/2010 4:36:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/16/2010
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />2.05.6(6) <br />(f)(v)(B) <br />TR -65 <br />f3 FF�ovEp <br />No pre- subsidence survey is proposed for the power line support towers <br />located along Terror Creek because they are located in a limited extraction <br />zone. A pre- subsidence survey has been clone for Bruce Park dams, see <br />Volume X. The pre- subsidence survey consists of a Geotechnical Data <br />Report for the Bruce Park Dam and an Addendum to that report both <br />presented in Volume X. The geotechnical reports present geologic mapping <br />and subsurface geotechnical data for the main dam and saddle dam. An <br />additional pre- subsidence inspection of the Bruce Park dams, Bruce Park <br />Landslide and the surrounding area was preformed by YEH and Associates, <br />Inc. during 2007. Their report is presented !in Volume IIIA, Tab 22. <br />Monitoring <br />See tables on pages 2.05 -121 and 2.05 -122. <br />The hydrologic monitoring program will continue. At least quarterly <br />monitoring will be performed. Surface streams, ponds, springs and <br />groundwater will continue to be monitored. The results of the monitoring will <br />be observed for abrupt changes in water levels, flows or quality which might <br />indicate mining impact. <br />The Operator has set up a subsidence network over the first five B -Seam <br />longwall panels to gain as much information as possible to compare actual <br />data with the subsidence predictions presented in Volume IIIA, Exhibits15, <br />17 and 21. Additionally, the actual subsidence data will be utilized to check <br />the design and effectiveness of limited extraction zones. <br />At the request of the DRMS and UDSA -FS the Operator installed eight <br />subsidence monuments in the limited extraction zone along Hubbard Creek <br />(monuments 17 -A through 17 -H). These monuments will be utilized to verify <br />that subsidence does not occur along the limited extraction zone. Six of the <br />monuments were installed during 2001 prior to the November 2002 longwall <br />start-up in panel D -7. Two of the monuments 17 -G & 17 -H will be installed in <br />2009 prior to the initiation of mining in Panel B -9. At the request of the <br />DRMS the Operator has identified twenty (20) subsidence monuments to <br />measure settlement over superimposed mullti -seam extraction as follows: <br />2.05-118- 12/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.