My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_PERMIT FILE - C1996083A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-16_PERMIT FILE - C1996083A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:12 PM
Creation date
6/9/2010 4:36:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/16/2010
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6 <br />• obtained semi - annually during the second and fourth quarters. During <br />August of each year a sample will be obtained and analyzed for the <br />parameters on List 2. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Gulches A, B, C, & D will be monitored quarterly at the designated upstream <br />and downstream monitoring locations shown on Map 9 except A-Gulch does <br />not have an upstream monitoring point. Field parameters will be measured <br />each quarter. A full suite sample from List 1 will be obtained semi - annually <br />during the second and fourth quarters. <br />Alluvial wells 1 through 9, 11, 12 and 14 through 17 will be monitored <br />quarterly for field parameters. A full suite sample will be obtained semi- <br />annually during the second and fourth quarters. <br />Culverts 1 throughA will be monitored quarterly for field parameters. A full <br />suite sample from List 1 will be obtained semmi- annually during the second <br />• and fourth quarters. <br />The sediment ponds will be monitored in accordance with discharge permit <br />requirements. During August of each year a sample will be obtained and <br />analyzed for the parameters on List 2 if the sediment ponds discharge. <br />Mine inflows will be measured semi - annually for field parameters. An annual <br />full suite analysis will be obtained for any point source of inflow greater than <br />5 gallons per minute. Results of the mine inflow monitoring including a seep <br />location map and seep rate of flow will be submitted with the annual <br />hydrologic report. During the development of the main entries under Terror <br />Creek, mine inflows will be measured and reported to the DRMS quarterly. <br />When the main entries under Terror Creek are complete, mine inflow <br />monitoring frequency will revert to semi - annually. <br />Small area exemptions shown on Map 20 will be monitored quarterly. The <br />Applicant will use its best efforts to obtain samples. The samples will be <br />analyzed for pH, conductivity and total settleable solids. Samples will be in <br />compliance if they contain settleable solid levels of 0.5 ml /I or less and the <br />pH is greater than 6.5 and less than 9.0. <br />The following pages list the water monitoring stations. <br />• <br />TR -65 <br />A PFRaVC-D <br />q�i 6 //a <br />2.05-78 <br />12/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.