My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_PERMIT FILE - C1996083A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-16_PERMIT FILE - C1996083A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:12 PM
Creation date
6/9/2010 4:36:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/16/2010
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6 <br />(3)(b)(iv) <br />Hydrologic Monitoring Plan <br />The following monitoring plan is designed to provide data which will verify the <br />Bowie No. 2 Mine will not have significant adverse impacts on the surface or <br />subsurface water which is within or adjacent to the permit area. The hydrologic <br />monitoring locations, shown on Map 9 are: <br />Springs will be monitored quarterly. Depending on weather conditions, the first <br />quarter monitoring event may be delayed until April or May. Field parameters will <br />be measured each quarter and a full suite sample will be obtained each quarter <br />from all springs which have a flow of five gallons per minute or more. Spring <br />monitoring will include water right map codes 1 through 5 which are decreed <br />water rights described as J & M Spring & PL No. 1 - 5. J & M Spring & PL No. 1 - <br />4 are on the Applicants land and are owned by the Applicant. <br />Stock Ponds will be monitored quarterly. Depending on weather conditions, the <br />first quarter monitoring event may be delayed iuntil April or May. The following <br />• information will be collected for the ponds; 1) inflow; 2) outflow; and 3) water level <br />below spillway outlet or depth of water in pond measured from the bottom of the <br />pond. <br />The following fourteen drill holes will be monitored: DH -15, DH -25, DH -38, DH- <br />39, DH -49, DH -65, DH -67B, DH -67D, DH- 67Abv, DH- 67BIw, TC- 03- 01(B), TC- <br />03- 01(R), TC- 03 -02, TC- 03 -03, 2010 -1. Depending on weather conditions, the <br />first quarter monitoring event may be delayed until April or May. Field parameters <br />will be measured each quarter. A full suite sample will be obtained semi - annually <br />during the second and fourth quarters. <br />The Deer Trail Ditch will be monitored at the designated upstream and <br />downstream monitoring locations (designated ADTDC on Map 9). Field <br />parameters will be measured each quarter. A full suite sample from List 1 will be <br />obtained semi - annually during the second and fourth quarters. During August of <br />each year a sample will be obtained and analyzed for the parameters on List 2. <br />0 <br />TR -65 2.05-76 02/10 <br />PFPaKl) <br />V /b// b <br />
The URL can be used to link to this page
Your browser does not support the video tag.