Laserfiche WebLink
2.05.6 <br />(3)(b)(iv) <br />Hydrologic Monitoring Plan <br />The following monitoring plan is designed to provide data which will verify the <br />Bowie No. 2 Mine will not have significant adverse impacts on the surface or <br />subsurface water which is within or adjacent to the permit area. The hydrologic <br />monitoring locations, shown on Map 9 are: <br />Springs will be monitored quarterly. Depending on weather conditions, the first <br />quarter monitoring event may be delayed until April or May. Field parameters will <br />be measured each quarter and a full suite sample will be obtained each quarter <br />from all springs which have a flow of five gallons per minute or more. Spring <br />monitoring will include water right map codes 1 through 5 which are decreed <br />water rights described as J & M Spring & PL No. 1 - 5. J & M Spring & PL No. 1 - <br />4 are on the Applicants land and are owned by the Applicant. <br />Stock Ponds will be monitored quarterly. Depending on weather conditions, the <br />first quarter monitoring event may be delayed iuntil April or May. The following <br />• information will be collected for the ponds; 1) inflow; 2) outflow; and 3) water level <br />below spillway outlet or depth of water in pond measured from the bottom of the <br />pond. <br />The following fourteen drill holes will be monitored: DH -15, DH -25, DH -38, DH- <br />39, DH -49, DH -65, DH -67B, DH -67D, DH- 67Abv, DH- 67BIw, TC- 03- 01(B), TC- <br />03- 01(R), TC- 03 -02, TC- 03 -03, 2010 -1. Depending on weather conditions, the <br />first quarter monitoring event may be delayed until April or May. Field parameters <br />will be measured each quarter. A full suite sample will be obtained semi - annually <br />during the second and fourth quarters. <br />The Deer Trail Ditch will be monitored at the designated upstream and <br />downstream monitoring locations (designated ADTDC on Map 9). Field <br />parameters will be measured each quarter. A full suite sample from List 1 will be <br />obtained semi - annually during the second and fourth quarters. During August of <br />each year a sample will be obtained and analyzed for the parameters on List 2. <br />0 <br />TR -65 2.05-76 02/10 <br />PFPaKl) <br />V /b// b <br />