My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_PERMIT FILE - C1996083A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-16_PERMIT FILE - C1996083A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:12 PM
Creation date
6/9/2010 4:36:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/16/2010
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6 <br />Leachate from the refuse piles and coal stockpile could also degrade the <br />water quality of the river. Refuse Pile #1, refuse piles #2 & 4, refuse pile #3, <br />and the coal pile will encompass 1. 1, 36.4, 15.8 and 4.9 acres at full capacity <br />respectively. Based on the Upper B -Seam geochemical analysis presented <br />in Volume 111, Exhibit 6, the average conductivity of the roof, interburden and <br />floor samples is 1190 and coal is 505 umhos /cm. According to Section <br />2.04.8 the average annual rainfall in the area is 18.5 inches. If all of this <br />rainfall percolated through the piles during the year, the equivalent flow <br />would be 55.6 gallons per minute. In its Cumulative Hydrologic Impact Study <br />for the North Fork of the Gunnison dated September 25, 1992, the DRMS <br />assumed infiltration through a refuse pile is the result of snowmelt and it was <br />estimated 2.8 inches per year would infiltrate during a 60 day period. The <br />equivalent flow for this assumption over the 58.2 acre piles is 51.2 gallons <br />per minute over the 60 day period. The two different leachate production <br />estimates produce similar equivalent flow values. <br />Alluvial wells were installed to monitor groundwater contamination. AW -1, <br />AW -2 and AW -3 are near the coal stockpile. AW -4, AW -5 and AW -6 are <br />. near the gob pile No. 1. AW -15, AW -16 and AW -17 are below Gob Pile No. <br />2. The water quality in the wells is poor to good. Following is a summary of <br />baseline conductivity measurements (umhos /cm) for the alluvial wells <br />obtained from the Annual Hydrology Reports. <br />Predicted based on conductivity measurement from an Upper B -Seam coal sample. <br />• <br />TR-64 2.05-74 09/09 <br />i9 PPePavga <br />AW -1 <br />AW -2 <br />AW -3 <br />Min <br />8900 <br />1075 <br />3600 <br />Max <br />9300 <br />9700 <br />3600 <br />Average <br />9100 <br />5344 <br />3600 <br />Coal Pile Leachate <br />505 <br />505 <br />505 <br />Predicted based on conductivity measurement from an Upper B -Seam coal sample. <br />• <br />TR-64 2.05-74 09/09 <br />i9 PPePavga <br />
The URL can be used to link to this page
Your browser does not support the video tag.