Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />_.._._ <br />PROJECT IDENTIFICATION <br />Task # : 072 State : Colorado Permit/job # : C -96 -083 <br />Date : 1110212009 County : Delta Abbreviation : none <br />User: JRS Site Bowie No. 2 Mine Filename C083-072 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip Truck Loadout Road <br />;. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : ( CRG) <br />MATERIAL QUANTITIES <br />Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 4,800 BCY Load factor : NA Bank volume <br />Area : NA acres Rip depth (ft) : NA Volume <br />4,800 <br />NA <br />BCY <br />BCY or CCY <br />Source of estimated quantity : Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: 5,000 feet/second <br />Unadjusted production : 673.60 cu. yds. /hour <br />Unadjusted production <br />per selected method <br />Area : Avg. ripping depth : <br />NA <br />feet/pass <br />Average ripping width : <br />NA <br />feet/pass <br />Average ripping length : <br />NA <br />feet/pass <br />Average dozer speed : <br />NA <br />feet/minute <br />Average maneuver time: <br />NA <br />minutes /pass <br />Production per unit area : <br />NA <br />acres /hour <br />Unadjusted production : <br />NA <br />cu. yds. /hour <br />JOB TIME AND COST <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />673.60 <br />cu. yds. /hour <br />6,000 <br />feet <br />1.00 <br />(Cat HB) <br />0.83 <br />(1 shift/day) <br />0.83 <br />multiplier <br />559.09 <br />2,236.35 <br />cu. yds. /hour <br />cu. yds. /hour <br />Fleet size : 4 dozer(s) Total job time: 2.15 hours <br />Unit cost : $0.474 per cu. yd. Total job cost: $2,273 <br />