My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 070 State : Colorado Permit/job # : C -96 -083 <br />Date : 1110212009 County : Delta Abbreviation : none <br />User: JRS Site :Bowie No. 2 Mine Filename :C083 -070 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip Haul Roads (Portion Being Reclaimed) and Old Truck Loadout <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br />Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 260,481 BCY Load factor: NA Bank volume: 260,481 BCY <br />Area : NA acres Rip depth (ft) : NA Volume: NA BCY or CCY <br />Source of estimated quantity Operator Estimate <br />Source of estimated load factor : <br />a... <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: 5,000 feet/second Unadjusted production <br />Unadjusted production : 673.60 cu. yds. /hour per selected method : 673.60 cu. yds. /hour <br />Area : Avg. ripping depth : <br />NA <br />feet/pass <br />Average ripping width : <br />NA <br />feet/pass <br />Average ripping length : <br />NA <br />feet/pass <br />Average dozer speed : <br />NA <br />feet/minute <br />Average maneuver time: <br />NA <br />minutes /pass <br />Production per unit area : <br />NA <br />acres /hour <br />Unadjusted production : <br />NA <br />cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Unit cost : $ 0.474 per cu. yd. <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />6,500 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />cu. yds. /hour <br />cu. yds. /hour <br />hours <br />559.09 <br />2,236.35 <br />116.48 <br />$123,351 <br />