Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />_Y._._.,..�,. <br />PROJECT IDENTIFICATION <br />Task # : 065 State : Colorado Permit/job # : C -96 -083 <br />Date : 1110212009 <br />User: JRS <br />County : Delta <br />Site Bowie No. 2 Mine <br />Abbreviation : none <br />Filename :C083 -065 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip B -Seam Portal Bench <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi- Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />Average maneuver time: 0.25 minutes /pass <br />Production per unit area : 0.730 acres /hour <br />Unadjusted production : 3,390.93 cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />2,814.47 cu. yds. /hour <br />11,257.90 cu. yds. /hour <br />3.39 hours <br />Unit cost : $0.092 per cu. yd. Total job cost: $3,524 <br />Data source : <br />(CRG <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : <br />$86.56 <br />NA <br />Dozer operating cost/hour : <br />$126.50 <br />100 <br />Ripper operating cost/hour : <br />$8.09 <br />100 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$259.69 Total fleet cost/hour : <br />$1,038.77 <br />MATERIAL QUANTITIES � <br />Selected estimating method : <br />Area <br />Alternate methods - <br />Seismic : NA NA Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 9.00 acres Rip depth (ft) : <br />2.63 Volume: <br />38,188 <br />BCY or CCY <br />Source of estimated quantity : Operator Estimate <br />Source of estimated load factor : <br />r . <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second <br />Unadjusted production <br />Unadjusted production : NA cu. yds. /hour <br />per selected method : <br />3,390.93 <br />cu. yds. /hour <br />Area : Avg. ripping depth : 2.88 feet/pass <br />Site altitude : <br />6,750 <br />feet <br />Average ripping width : 8.67 feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : 50.00 feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : 88.00 feettminute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: 0.25 minutes /pass <br />Production per unit area : 0.730 acres /hour <br />Unadjusted production : 3,390.93 cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />2,814.47 cu. yds. /hour <br />11,257.90 cu. yds. /hour <br />3.39 hours <br />Unit cost : $0.092 per cu. yd. Total job cost: $3,524 <br />