Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />am <br />PROJECT IDENTIFICATION <br />Task #: 037 State :Colorado Permit/job# : C - 1996 - 083 <br />Date : <br />User: <br />11/02/2009 <br />JRS <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Spread Uncompacted Refuse at Gob Pile #3 <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />volume : 200,000 LCY <br />factor : <br />NA volume: <br />200,000 <br />LCY <br />Unit cost: <br />Source of estimated volume <br />TR -44 Submittal - Page 4 <br />Total job cost: <br />$101,711 <br />Source of estimated swell factor : <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 200 <br />feet <br />Material consistency: <br />1. 10 <br />(Cat HB) <br />Unadjusted hourly production : 946.0 <br />LCY /hr <br />Dozing method : <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shift1day) <br />Partly consolidated stockpile <br />Spoil pile: <br />1.00 <br />(doz -oc) <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Average push gradient: 5.00 <br />% (pos) <br />Altitude : <br />1.00 <br />( Cat HB) <br />Average site altitude : 6,100 <br />feet <br />Material weight: <br />0.86 <br />(user) <br />Blade type: <br />1.00 <br />(S /SU /U) <br />Material weight: Z667 <br />Ibs /LCY <br />Net correction : <br />0.53 <br />Weight description <br />USER - PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />County : Delta <br />Site Bowie No. 2 Mine <br />Adjusted unit production <br />Adjusted fleet production <br />Abbreviation : none <br />Filename :C083 -037 <br />504.57 <br />2,018.29 <br />LCY/hr <br />LCY /hr <br />Fleet size : <br />4 <br />Dozer(s) <br />Total job time : <br />99.09 Hours <br />Unit cost: <br />$0.509 <br />/LCY <br />Total job cost: <br />$101,711 <br />�; <br />