Laserfiche WebLink
CIRCES Cost Estimating Softwai <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 019 State : Colorado Permit/job# : C -96 -083 <br />Date : 1110212009 County : Delta Abbreviation : none <br />User: JRS Site Bowie No. 2 Mine Filename : C083 -019 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description: Regrade Drill Pads from MR's and TR's <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />Average push distance : 100 feet <br />Unadjusted hourly production: 1,718.9 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />4.00 % (pos <br />7,500 feet <br />Material weight: Z900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Operator skill : <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 <br />Material consistency: <br />NA <br />Operating cost/hour : $128.30 <br />Dozing method : <br />100 <br />Ripper op. cost/hour : $0.00 <br />Visibility: <br />0 <br />Operator cost/hour : $38.54 <br />Job efficiency : <br />NA <br />Total unit cost/hour : $256.60 <br />Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />(fnd -rl) <br />Initial Swell <br />Loose <br />volume: 133,850 CCY factor : 1.165 <br />volume: 155,935 LCY <br />Source of estimated volume Division Estimate <br />(Cat HB) <br />Source of estimated swell factor CAT Handbook <br />0.79 <br />(Cat HB) <br />HOURLY PRODUCTION _ Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production: 1,718.9 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />4.00 % (pos <br />7,500 feet <br />Material weight: Z900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Operator skill : <br />0.75 <br />(avg.) <br />Material consistency: <br />0.90 <br />(Cat HB) <br />Dozing method : <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency : <br />0.83 <br />(lshift/da) <br />Spoil pile: <br />0.80 <br />(fnd -rl) <br />Push gradient: <br />0.93 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.33 <br />Adjusted unit production : <br />565.67 <br />LCY /hr <br />Adjusted fleet production : <br />2,262,68 <br />LCY /hr <br />Total job time: 68.92 Hours <br />Unit cost: $0.454 /LCY Total job cost: $70,736 <br />Zf <br />