Laserfiche WebLink
Truck/Loader Team Work cont'd Task #: 014 sheet 2 of 2 <br />I oadin4 Tool Cycle Time . Number of loading tool passes required to fill truck <br />Excavators and front shovels - machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />5 passes <br />Track loaders - material descr.: <br />- cycle time elements (min.) : Load : NA Maneuver: NA <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml <br />Dump: 0.100 <br />0.600 minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material : <br />Mixed material <br />0.020 <br />(Cat HB) <br />Stockpile <br />Conveyor or dozer piled 10 ft. high or less <br />0.010 <br />(Cat HB) <br />Truck ownership : <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Operation : <br />Constant operation <br />-0.040 <br />(Cat HB) <br />Dump target :Nominal <br />target <br />0.000 <br />(Cat HB) <br />Road <br />segment# <br />Net cycle time adjustment: <br />-0.050 <br />minutes <br />Total <br />resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) : <br />0.550 <br />minutes <br />600 <br />Net load time per truck * : <br />2.300 <br />minutes <br />Truck Cycle Time: <br />R bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />687.34 <br />Truck exchange time * *: <br />0.70 minutes........ Adjusted for site altitude : <br />0.700 <br />minutes <br />Truck load time: <br />2.300 minutes........ Adjusted for site altitude : <br />2.300 <br />minutes <br />Truck maneuver and dump time: <br />1.10 minutes........ Adjusted for site altitude : <br />1.100 <br />minutes <br />— set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: <br />Road condition : Firm, smooth, rolling, dirt or light surfaced, watered, mainta <br />Haul route : <br />Hours <br />Unit cost : <br />$0.841 /LCY Total job cost : <br />Road <br />segment# <br />Haul distance <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />Travel time <br />(minutes)_ <br />1 <br />600 <br />0.00 <br />3.00 <br />3.00 <br />2983 <br />0.714 <br />687.34 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />595.52 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />595.52 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />103.68 <br />Hours <br />Unit cost : <br />$0.841 /LCY Total job cost : <br />$51,918 <br />Return route : Haul time ** : 0.714 minutes <br />minutes <br />minutes <br />Loading tool unit production : <br />717.50 LCY /hour...... Adjusted for job efficiency : <br />595.52 <br />LCY /hour <br />Truck unit production : <br />414.06 LCY /hour...... Adjusted for job efficiency : <br />343.67 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />2 trucks........... Selected no. trucks /loader : <br />2 <br />trucks <br />Adjusted hourly truck team production : <br />687.34 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />595.52 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />595.52 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />103.68 <br />Hours <br />Unit cost : <br />$0.841 /LCY Total job cost : <br />$51,918 <br />travel time shown for each segment includes acceleration /deceleration adjustment Return time * *: 0.385 <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 5.199 <br />