My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description :Regrade Old Truck Loadout Material St orage Area <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2 - 005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />0.75 <br />CIRCES Cost Estimating <br />Softwa <br />0.90 <br />Utilization <br />BULLDOZER WORK <br />Cost Breakdown : Ownership cost/hour : <br />$89.77 <br />Visibility: <br />NA <br />Operating cost/hour : <br />$128.30 <br />PROJECT IDENTIFICATION <br />100 <br />Ripper op. cost/hour : <br />Task #: <br />007 <br />State : Colorado <br />Permit/job# : C -96 -083 <br />Date : <br />1110212009 <br />County : Delta <br />Abbreviation : none <br />User: <br />JRS <br />Site : Bowie No. 2 Mine <br />Filename : C083 -007 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description :Regrade Old Truck Loadout Material St orage Area <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2 - 005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />10.00 % (pos) <br />6,500 feet <br />Material weight : 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Operator skill : <br />0.75 <br />Data source : (CRG) <br />Material consistency : <br />0.90 <br />Utilization <br />% <br />Cost Breakdown : Ownership cost/hour : <br />$89.77 <br />Visibility: <br />NA <br />Operating cost/hour : <br />$128.30 <br />0.83 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />(fnd -rf) <br />0 <br />Operator cost/hour : <br />$38.54 <br />Altitude : <br />NA <br />Total unit cost/hour : <br />$256.60 <br />Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Blade type : <br />1.00 <br />Initial Swell <br />Net correction : <br />Loose <br />volume: 9,790 CCY factor : <br />1.165 <br />volume : 11,405 LCY <br />Source of estimated volume : Page 3.02 -2 <br />Adjusted fleet production : <br />1,390.26 <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION _ Job Condition Correction Facto Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />10.00 % (pos) <br />6,500 feet <br />Material weight : 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Operator skill : <br />0.75 <br />(avg.) <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Dozing method : <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />( avg.) <br />Job efficiency: <br />0.83 <br />(1shift/da} <br />Spoil pile: <br />0.80 <br />(fnd -rf) <br />Push gradient: <br />0.79 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.28 <br />Adjusted unit production : <br />347.56 <br />LCY /hr <br />Adjusted fleet production : <br />1,390.26 <br />LCY /hr <br />Fleet size : <br />4 <br />Dozer(s) <br />Total job time : 8.20 Hours <br />Unit cost: <br />$0.738 <br />/LCY <br />Total job cost: $8,420 <br />�; <br />
The URL can be used to link to this page
Your browser does not support the video tag.