Laserfiche WebLink
Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip and Regrade Material Storage Area at Gob Pile <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />Dozer(s) <br />CIRCES Cost Estimating <br />Softwa <br />(CRG) <br />/LCY <br />BULLDOZER WORK <br />$1,777 <br />PROJECT IDENTIFICATION <br />Task #: <br />005 <br />State : Colorado <br />Permit/job# : C -96 -083 <br />Date : <br />1110212009 <br />County : Delta <br />Abbreviation : none <br />User: <br />JRS <br />Site Bowie No. 2 Mine <br />Filename : C083 -005 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip and Regrade Material Storage Area at Gob Pile <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />JOB TIME AND COST <br />Fleet size : 4 <br />Dozer(s) <br />Total job time: <br />Data source : <br />(CRG) <br />/LCY <br />Total job cost: <br />$1,777 <br />Utilization % <br />Cost Breakdown : <br />Ownership cost/hour : <br />$89.77 <br />NA <br />Operating cost/hour : <br />$128.30 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$256.60 Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 3,630 CCY <br />factor : <br />1.165 volume : <br />4,229 <br />LCY <br />Source of estimated volume Map 15 -1 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />� � � Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : <br />100 feet <br />Material consistency: <br />0.90 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,718.9 LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency : <br />0.83 <br />( 1shift/day) <br />Compacted fill or embankment <br />Spoil pile: <br />0.80 <br />(fnd - rl) <br />Push gradient: <br />1.00 <br />(Cat HB) <br />Average push gradient: <br />0.00 % (pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : <br />6,000 feet <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: <br />2,900 Ibs /LCY <br />Net correction : <br />0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : <br />61a 79 <br />LCY /hr <br />Adjusted fleet production : <br />2,443.18 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : 4 <br />Dozer(s) <br />Total job time: <br />1.73 Hours <br />Unit cost: $0.420 <br />/LCY <br />Total job cost: <br />$1,777 <br />v <br />