My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />-- CIRCES Cost Estimating Softwa <br />PROJECT IDENTIFICATION <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Task #: 001 State : Colorado Permit/job # : C -96 -083 <br />Date : 1110212009 County : Delta Abbreviation : none <br />User: JRS Site Bowie No. 2 Mine Filename : C083 -001 <br />Permit or other job action : 2009 Midterm Review <br />Task description Pull Back and Haul Portal Bench Fill Material to Cut Slope <br />HOURLY EQUIPMENT COST Eauin Shift basis: 1 per day <br />�ment f)acrrintinn <br />Truck/loader team -Truck <br />-Loader <br />Cat 773D (2002) <br />Cat 3658 L Series // (2005) <br />Support equipment -Load area : <br />-Dump area: <br />NA <br />NA <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />NA <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grad_ er Water Truck <br />Import data filename: <br />truck2 <br />excavate <br />NA <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />95 <br />100 <br />NA <br />NA <br />NA <br />NA <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$63.47 <br />$76.39 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour : <br />$82.68 <br />$102.49 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.72 <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$168.44 <br />$217.59 <br />NA <br />NA <br />NA <br />j NA <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group subtotals : <br />Work: $554.48 <br />Support: $0.00 1 <br />Maintenance: $0.00 <br />Total work team cost/hour : $554.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 260,953 CCY factor : 1.165 volume: 304,010 LCY <br />Material weight: 2,900 pounds /LCY Struck volume : <br />Descr.: Decomposed rock - 50% roc k, 50% earth Heaped volume: <br />Rated payload : 108,060 pounds Average volume: <br />Payload capacity: 37.26 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: Job Condition Corr ectiol <br />Rated capacity (nom. heaped) : 6.900 LCY r Truck <br />Descr. : Loose material - 1 " and over (85 - 90 %) Altitude adj.: 1.000 <br />Bucket fill factor: 0.875 Job efficiency: 0.830 <br />Adjusted bucket capacity: 6.038 LCY Net correction : 0.830 <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />37.26 LCY <br />36.23 LCY <br />Site altitude (ft.) : 6,900 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shift/da <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.