Laserfiche WebLink
Table 2 <br />AFFECTED AREAS FOR MINING AND RECLAMATION <br />• <br />Permitted Area <br />- Mine <br />- Loadout <br />Total <br />Limits of Underground Disturbance (Through end of second permit term) <br />Mine 1,427.2 acres <br />Surface Disturbance Area (L.ife of Mine) <br />2,713.7 acres <br />21.9 acres <br />2,735.6 acres <br />- Mine 85.0 acres <br />- Loadout 15.4 acres <br />Total 700.4 acres <br />• <br />• <br />MR-44 <br />2.03.40 <br />Revised -May 2002 <br />