Laserfiche WebLink
Attachment A <br /> Pa ge 2 <br /> Stipulation No. 7: <br /> THE PER14ITTEE WILL ACCOMPLISH INSPECTIONS OF THE STREETER CANYON <br /> FILL AND SUBMIT CERTIFIED INSPECTION REPORTS TO THE DIVISION IN <br /> ACCORDANCE WITH THE REQUIREMENTS OF THE PLAN DESIGNED IN ACCORDANCE <br /> WITH RULE 2.06. THESE INSPECTIONS AND CERTIFIED INSPECTION REPORTS <br /> WILL INCLUDE SPECIFIC EXAMINATION AND DISCUSSION OF THE FACIAL <br /> CONDITIONS OF THE FILL, IN ORDER TO DETERMINE WHETHER THE DEVELOP- <br /> MENT OF PERCHED WATER TABLES WITHIN THE FILL IS AFFECTING ITS <br /> SURFICIAL SLOPE STABILITY. FURTHER; IF THE REQUIRED ENGINEERING <br /> INSPECTIONS DETERMINE THAT SURFICIAL SLOPE FAILURE CONDITIONS ARE <br /> IMMINENT, OR IF SURFICIAL SLOPE FAILURE MANIFESTS ITSELF WITHIN <br /> STREETER CANYON FILL, THE PERMITTEE WILL PREPARE AND SUBMIT TO <br /> THE DIVISION DETAILED ENGINEERING PLo1NS TO ABATE ANY IMMINENT OR <br /> MANIFESTED SLOPE STABILITY PROBLEM. ANY APPROPRIATE REMEDIAL <br /> ACTIVITY SHALL COMMENCE 11-111EDIATELY FOLLOWING THE. APPROVAL OF <br /> THE DETAILED ENGINEERING PLANS BY THE DIVISION. <br />