Laserfiche WebLink
CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />Task #: 231 State : Colorado <br />Date: 0311612010 County : Della <br />User : JRS Site : Elk Creek Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 65 <br />Task description : Plug and Seal 33 Gob Vent Borehol <br />UNIT COSTS <br />Eouiomenl cost data source : NA <br />Permit/job # :C -1881 -022 <br />Abbreviation :n <br />Filename : CO22 -231 <br />Shift basis : 1 Der day <br />BOREHOLE DESCRIPTION <br />SEALING ITEM/ METHOD <br />IDIAMETER <br />LENGTH <br />{QUANTITY) <br />UNIT <br />UNIT COST <br />TOTAL COST <br />- Bottom Plug <br />PVC plug - 10 in. <br />9.625" <br />79,181' <br />33.00 <br />I EA <br />$184.03 <br />$6,073.15 <br />-Fill Holes with - Cement <br />-Cut Casing at Surface <br />- Borehole Marker <br />- Drill Rig Ti <br />-Water Truck Time <br />Portland cement grout <br />9.625" <br />1,650 <br />417.00 <br />I bag <br />$10.65 <br />$4,441.05 <br />$709.49 <br />$122.76 <br />Exp. casing removal, 8 -16 in. <br />Borehole marker <br />GENERIC 3.0 in. - 2, 800 ft. cap <br />9.625" <br />NA <br />83.00 <br />I LF <br />$8.55 <br />NA <br />NA <br />33.00 <br />EA <br />$3.72 <br />NA <br />NA <br />NA <br />NA <br />99.00 <br />99.00 <br />HR <br />HR <br />592.87 <br />$60.90 <br />$9,194.0 <br />$6,029.30 <br />Water Tanker, 2,500 Gal. <br />I <br />I <br />I <br />I <br />I <br />I <br />G <br />I <br />I <br />I <br />I <br />I <br />JOB COST Total Cost : $ 26,370 <br />