My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-07_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-06-07_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:51 PM
Creation date
6/8/2010 1:47:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/7/2010
Doc Name
Adequacy Response (Emailed)
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
PR6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PR-06 Is` DESCRIPTION LOCATION OF ANSWER <br />Adequacy <br />January 10te <br />2010 <br />Question # <br />13 Fix 3`d sentence in Section 2.04.9. See Section 2.04.9 subsection <br /> subsection 10.2 paragraph 1. 10.2 paragraph 1. <br />14 Fix references to prime farmland soil and See Section 2.04.3 subsection <br /> prime farmland in Sections 2.04.3, 2.04.9 6.0, 2.04.9 subsection 10.4, <br /> and 2.05.4(2)(d). and Section 2.05.4(2)(d) <br /> subsections 8.1.4 and 8.1.5. <br /> Also, see revised Map 2.04.9-1. <br />15 Revise pages in Section 2.05.3(3) Mine See page 12 of Section <br /> Facilities to note when pit pumping was 2.05.3(3) Mine Facilities <br /> changed from Pond 007 to Pond 011. <br />16 Change text to read Permit Revision No. 6 See page 23 of Section <br /> instead of Permit Amendment of 2009. 2.05.3(3) Mine Facilities <br />17 Fix typo error reference to Pond 015. See page 24 of Section <br /> 2.05.3(3) Mine Facilities <br />18 Provide details of mine traffic crossing of See pages 36 and 37 of Section <br /> 2700 Road. 2.05.3(3) Mine Facilities <br />19 Update Table 2.05.3(3)-3 for road, ditch See updated Table 2.05.3(3)-3 <br /> and utility detours. in Section 2.05.3(3). <br />20 Update Table 2.05.3(3)-5 to reflect current See updated Table 2.05.3(3)-5 <br /> status overhead power and buried phone in Section 2.05.3(3). <br /> line relocation status. <br />21 Revise Attachment 2.05.3(3)-8 for road See Revised Attachment <br /> and structure agreements. 2.05.3(3)-8 <br />22 Correct statement in Section 2.05.3(3) See corrected text in Section <br /> Mine Facilities on page 14-2 that states 2.05.3(3) Mine Facilities on <br /> that the pre-mine drainage basins have page 14-2 . <br /> changed. <br />23 Correct as built stage storage curve for See corrected Map 2.05.3(3)- <br /> Pond 011 on Map 2.05.3(3)-17. 17. <br />24 Revise Pond 012 re-design. See Attachments 2.05.3(3)-12 <br /> and 2.05.3(3)-13 and Map <br /> 2.05.3(3)-12-4. <br />25 Revise emergency spillway elevation on See revised Map 2.05.3(3)-18. <br /> Map 2.05.3(3)-18.
The URL can be used to link to this page
Your browser does not support the video tag.