My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-07_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-06-07_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:51 PM
Creation date
6/8/2010 1:47:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/7/2010
Doc Name
Adequacy Response (Emailed)
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
PR6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2"d Adequacy Description Location of Answer <br />Letter April 6, <br />2010 Question # <br />76 Revise Table 2.04.9-2 regarding Soil See revised Table 2.04.9-2 <br /> Suitability to reflect pre-mine sampling and revised Table <br /> and revise Table 2.05.4(2)(d)-1 to 2.05.4(2)(d)-1. <br /> reflect the post-mine soil sampling. <br />77 Correct formatting problems with See revised Table 2.04.9-1. <br /> Table 2.04.9-1. <br />78 Clarify sampling requirements for See revised Table <br /> subsoil, topsoil and spoil. 2.05.4(2)(d)-1 and <br /> subsections 8.1.6 and 8.1.7.° <br />79 Clarify coarse fragment requirements See revised Table <br /> in replacement soil sampling. 2.05.4(2)(d)-1 (footnote 5)and <br /> text in subsection 8.1.7. <br />80 Revise procedures for follow up See revised subsection 8.1.7 <br /> sampling of Bench 1 material used as page 19 for follow up <br /> suitable subsoil and re-sample the sampling procedures. <br /> upper 2 feet of subsoil at Site 32 for <br /> saturated paste extract EC. <br />81 State that replaced subsoil and topsoil See revised subsection 8.1.7 <br /> will be measured and reported and page 19. The upper 2 feet of <br /> submitted with the Annual Report. subsoil at Site 32 was re- <br /> sampled and tested for <br /> saturated paste extract EC. <br /> The results will be delivered <br /> in the Annual Report. <br />82 Correct reference to Map 2.04.10-1 on See corrections on page <br /> page 2.04.9-9. Fix reference to Table 2.04.9-9. <br /> 2.04.3-1 on the same page. <br />83 Revise text in Section 2.05.4(2)c) See revised text in middle of <br /> Backfilling and Grading to show that page 6 in Section 2.05.4(2)c) <br /> the excess backfill that would have Backfilling and Grading and <br /> been placed on the Morgan property new Attachment 2.05.4(2)c)- <br /> has been placed on the Benson west 7. <br /> and Lloyd properties. <br />11
The URL can be used to link to this page
Your browser does not support the video tag.