My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-08_REVISION - C1981025
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981025
>
2010-06-08_REVISION - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:54 PM
Creation date
6/8/2010 1:47:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
REVISION
Doc Date
6/8/2010
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Minrec Inc
Type & Sequence
TR25
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 L O RA D O <br />Phone: (303) 866-3567 1 s 1 0 N O F <br />LAMATION <br />M <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br /> Bill Ritter, Jr. <br /> Governor <br /> <br />June 8, 2010 James B. Martin <br />Executive Director <br /> Loretta E. Pineda <br />James E. Stover Director <br />MINREC, Inc. <br />2352 N 7th St, Ste B <br />Grand Junction, CO 81501-8168 <br />Re: North Thompson Creek Mine (Permit No. C-1981-025) <br />Proposed Decision - Technical Revision No. 25 (TR-25) <br />Update Permit Boundary <br />Dear Mr. Stover: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 25 at the North Thompson Creek Mine. Notice of the proposed decision will be published <br />in the Glenwood Springs Post Independent as soon as possible. The first publication will initiate the ten <br />(10) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />Enclosure <br />C-TPCV19 1025.JRS 06082010090859.doc Office of <br />Mined Lan Recamafon - Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.