Laserfiche WebLink
amec <br />Earth 8 Environmental <br />Completed Phase 5 VLF Underground Workings <br />5/8/2010 <br />-1 D# Northing Eastin Elevation Comments <br />3001 52251.5 37816.3 9736.9 Remediation Complete <br />3004 51832.1 38288.2 9758.5 Remediation Complete <br />3002 50199.5 40213.7 10174.9 Working not within the Phase 5 VLF footprint. No remediation necessary <br />3003 49681.9 39111.9 10222.5 Working not within the Phase 5 VLF footprint. No remediation necessary <br />3005 49798.4 39013.1 10132.9 Working removed during cut. Remediation complete. <br />3006 51789.0 37851.2 Pending Remediation Complete. <br />3007 51847.0 37844.8 Pending Remediation Complete. <br />3008 51975.1 37884.3 Pendin Workin backfilled. Geo rid ca laced and remediation complete. <br />3009 51870.1 37736.8 Pending Remediation Complete. <br />3010 51840.6 37709.8 Pending Remediation Complete. <br />3011 50460.9 39584.8 Pending Structural fill laced in area. No working found. Remediation not necessary. <br />Pending Phase 5 VLF Underground Workings <br />5/8/2010 <br />-1 D# Northing Eastin Elevation Comments <br /> <br />3012 <br />49494.6 <br />38098.3 <br />9706.9 Accessible portion of working remediated. Remaining portion will be <br />remediated after cut is performed in the area. <br />3013 49607.6 38134.4 Pending Confirmatory Drilling performed. Area will be observed during slope cut. <br />VLF Weekly Report WE 05.08.10.D