Laserfiche WebLink
amec <br />Earth & Environmental <br />G) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT D-8 dozer, a CAT 320 excavator, a <br />CAT 966 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location This Week <br />tons Cumulative Comments <br />E Cresson Clay Processing 15,945 105,505 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 15,945 337,909 <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D-10 dozer and a skid steer loader were used to process the material. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 11,810 308,719 <br />H) Miscellaneous <br />No work was performed during the week. <br />111) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />VLF Weekly Report WE 05.08.10.D