My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_HYDROLOGY - M1980183
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980183
>
2010-06-04_HYDROLOGY - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:46 PM
Creation date
6/7/2010 1:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
HYDROLOGY
Doc Date
6/4/2010
Doc Name
Ground Water Mounding Concern
From
Vranesh and Raisch, LLP
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 2, 2010 <br />Ben Frei <br />Albert Frei & Sons, Inc. <br />P.O. Box 700 <br />Henderson, CO 80640 <br />Re: Frei's Stagecoach PitBrannan's Pit 29 <br />Dear Ben: <br />I am writing to confirm the understanding we reached about the Stagecoach Drainage Project <br />which was designed to address the alleged ground water mounding in the vicinity of the above <br />referenced lined gravel pits that appear to be adversely affecting Zigan Lake. Without admitting <br />any liability or responsibility for the alleged ground water mounding, Brannan has agreed to <br />contribute $98,000 to the Project on the following conditions: <br />a. Frei will award construction of the Project to Brannan based on Brannan's bid <br />with a "bid date" of April 13, 2010 in the amount of $243,895.36; <br />b. Brannan will receive from Frei, the Zigan Homeowners' Association, and any <br />individual homeowner in the vicinity of Zigan Lake that may be affected by the alleged ground <br />water mounding a release and indemnity from any liability or responsibility for the alleged <br />ground water mounding (but not for any defects in Brannan's construction of the Project) in form <br />and substance acceptable to our attorney; and <br />c. Frei has and will continue to address, at its sole cost, any ground water mounding <br />impacts until construction of the Project is complete using the pumps and pipes currently in <br />place. <br />It is our understanding that the work will be done in the October-November timeframe when the <br />natural. ground water levels are low and that the Zigan homemmiers have agreed to this <br />construction schedule. <br />If I have accurately captured the essence of our agreement, please so signify in the space <br />provided below. <br />Thanks and please <br />Si <br />'t hesitate to call if you have any questions. <br />J.C. Marvel, Jr. V ' ! <br />Brannan Sand and Gravel Company <br />,?ooooo?h <br />YOU BET <br />BRA'?vNAfV <br />DID IT <br />2500 East Brannan Way I Denver I CO 80229 1 303.534.1231 Tel 1 303.534.1236 Fax <br />www.brannani.com
The URL can be used to link to this page
Your browser does not support the video tag.