Laserfiche WebLink
PR-06 1s` DESCRIPTION LOCATION OF ANSWER <br />Adequacy <br />Question # <br />52 Revise Attachment 2.05.4(2)(e) - 8 to See revised Attachment <br /> include all landowner correspondence. 2.05.4(2)(e) - 8 <br />53 Include planned and existing irrigation See revised Map 2.05.4-5. <br /> structures on Map 2.05.4-5. <br />54 Show NRCS concurrence with water See revised subsection 2.0 of <br /> share/acre ratios for irrigated lands and Section 2.05.4(2)(e) <br /> also describe how landowners could <br /> irrigate more land if water became <br /> available after bond release. <br />.55 Clarify Dirk Richards/James Martin See revised subsection 11.0 of <br /> property water rights and reclamation Section 2.05.4(2)(e). <br /> status. <br />56 Clarify post-mining irrigated land types See revised subsection 2.0 of <br /> Section 2.05.4(2)(e) <br />57 Clarify that irrigated pasture will be See revised subsection 2.0 of <br /> restored to lands that were identified as Section 2.05.4(2)(e) <br /> irrigated hay and irrigated pasture in the <br /> pre-mine studies. <br />58 Fix sentence fragment in subsection 2.0 of See revised subsection 2.0 of <br /> Section 2.05.4(2)(e) Section 2.05.4(2)(e) <br />59 Explain reclamation history of Staats See revised page 8 of Section <br /> property (6.73 acres) reclaimed to 2.05.4(2)(e). <br /> Pastureland Irrigated Grass <br />60 Clarify extent of prime farmland in the See revised subsection 2.0 of <br /> proposed reclamation plan, using soils and Section 2.05.4(2)(e) and <br /> water availability. Attachment 2.05.4(2)(e) - 7 <br /> showing all calculations for the <br /> irrigation. See revised Map <br /> 2.05.4-5. <br />61 Add information in subsection 6.1 of Subsection 6.1 of Section <br /> Section 2.05.4(2)(e) regarding use of 2.05.4(2)(e) has been revised to <br /> Morgan alfalfa field outside the mine remove all references regarding <br /> permit as a way to gather information for use of Morgan alfalfa field <br /> establishing a new reclamation standard for outside the mine permit as a <br /> Irrigated Cropland. way to gather information for <br /> establishing a new reclamation <br /> standard for Irrigated Cropland.