My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-02_PERMIT FILE - M2008012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008012
>
2010-06-02_PERMIT FILE - M2008012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:40 PM
Creation date
6/4/2010 2:31:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008012
IBM Index Class Name
PERMIT FILE
Doc Date
6/2/2010
Doc Name
Cost summary form
From
DRMS
To
Last Chance Mine
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 10a State : Colorado <br />Date : 0610212010 County :Montrose <br />User : GRM Site: Last Chance Mine <br />sheet 1 of 2 <br />Permit/job # :M-2008-012 <br />Abbreviation :none <br />Filename :M012-10a <br />Permit'or other job action :Final Reclamation Liability Estimate <br />Task description :secondary reclamation mobilization <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour., $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Nf1A1_RnAnAR1 F FCJIIIPMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-CAT 246 (2004) 3.58 $5.48 $88.67 1 $94.15 $88.67 $0.00 <br />-reveg equipment 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $207.82 $177.34 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.