Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 09a State :Colorado <br />Date :0610212010 <br />User : GRM <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :Initial Mobilization to Site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description <br />-CAT 246 (2004) <br />-reveg equipment <br />-Cat D8R Series 11- 8SU (20 Weight/unit <br />(Tons) <br />3.58 <br />10.00 <br />52.55 Ownership <br />Cost/hr/unit <br />$5.48 <br />$25.00 <br />$46.56 Haul Rig <br />Cost/hr/unit <br />$88.67 <br />$88.67 <br />$125.45 Fleet Size <br />(No. units) <br />1 <br />1 <br />1 Haul Trip <br />Cost/hr/fleet <br />$94.15 <br />$113.67 <br />$172.01 Return Trip <br />Cost/hr/fleet <br />$88.67 <br />$88.67 <br />$125.45 DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $379.83 $302.79 $0.00 <br />N <br />sheet 1 of 2 <br />County :Montrose <br />Site :Last Chance Mine <br />Permit/job #: M-2008-012 <br />Abbreviation :none <br />Filename :M012-09a