Laserfiche WebLink
PART I - INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review of the Trapper Mining, Inc. <br />("TMI") Trapper Mine. The Colorado Division of Reclamation, Mining and Safety ("Division") <br />conducted this review for the purpose of fulfilling the requirements of the Colorado Surface Coal <br />Mining Reclamation Act ("Act"j, and the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining ("Regulations"). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I - Introduction <br />Part II- Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III - Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each mining <br />and reclamation permit prior to the middle of the permit's term (2 %2 years). Based on this <br />Midterm Review, for good cause shown, the Division may require the permittee to revise or <br />modify the permit in order to ensure compliance with the Act and Regulations. <br />Table 1 lists the other Sections of the Regulations that require a Midterm Review of specific <br />aspects of each permit. <br />Trapper Midterm 2010 Findings. REV 3.docx Page 1