My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2010-06-04_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:46 PM
Creation date
6/4/2010 10:31:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/4/2010
Doc Name
Midterm Review Findings Document
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I - INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review of the Trapper Mining, Inc. <br />("TMI") Trapper Mine. The Colorado Division of Reclamation, Mining and Safety ("Division") <br />conducted this review for the purpose of fulfilling the requirements of the Colorado Surface Coal <br />Mining Reclamation Act ("Act"j, and the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining ("Regulations"). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I - Introduction <br />Part II- Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III - Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each mining <br />and reclamation permit prior to the middle of the permit's term (2 %2 years). Based on this <br />Midterm Review, for good cause shown, the Division may require the permittee to revise or <br />modify the permit in order to ensure compliance with the Act and Regulations. <br />Table 1 lists the other Sections of the Regulations that require a Midterm Review of specific <br />aspects of each permit. <br />Trapper Midterm 2010 Findings. REV 3.docx Page 1
The URL can be used to link to this page
Your browser does not support the video tag.