Laserfiche WebLink
Initial Pool Elev: 6,776.75 ft <br />Initial Pool: 22.20 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,776.60 25.00 5.00:1 2.50:1 10.00 <br />Pond Results: <br />Peak Elevation: 6,777.00 ft <br />Dewater Time: 0.62 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation- Capacity- Discharge Table <br />�J <br />N <br />Filename: SCM- 2_Operational Conditions_1109.sc4 <br />2.05.3 -E2.G -2.218 <br />Printed 12 -12 -2009 <br />12/09 <br />SEDCAD 4 for Windows <br />f:nnvrinV,} 1 aan - , )nn7 D -1. I Q,K-.K <br />Structure #2 (Null <br />• <br />PM -6b <br />Structure #4 (Null <br />PM- 6UP,oerMid <br />Structure #6 (Null <br />PM- 6Middle <br />Structure #8 (NuIQ <br />PM- 6towerMid <br />Structure #13 (Null <br />PM- 6Lower <br />Structure #16,�Nul!) <br />Culvert SG10 <br />Structure #17 (Null, <br />SCM - -1 <br />• <br />Structure #21 (Pond <br />Pecoco Pond <br />Pond Inputs: <br />Initial Pool Elev: 6,776.75 ft <br />Initial Pool: 22.20 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,776.60 25.00 5.00:1 2.50:1 10.00 <br />Pond Results: <br />Peak Elevation: 6,777.00 ft <br />Dewater Time: 0.62 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation- Capacity- Discharge Table <br />�J <br />N <br />Filename: SCM- 2_Operational Conditions_1109.sc4 <br />2.05.3 -E2.G -2.218 <br />Printed 12 -12 -2009 <br />12/09 <br />