My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-06-04_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:49 PM
Creation date
6/4/2010 9:52:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
6/4/2010
Doc Name
Midterm Review Findings Document
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT6
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION _ <br />Task # : 065 State : Colorado Permit/job #: C-1981-010 <br />Date : 0310312010 County :Moffat Abbreviation :none <br />User : JDM Site :Trapper Mine Filename : C010-065 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description : Rip West Ash Hau/roads (West Ash, West Ash1, and West Ash 2) <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $86.56 NA <br />Dozer operating cost/hour : $126.50 100 <br />Ripper operating cost/hour:- <br />ost/hour : $8.09 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $259.69 Total fleet cost/hour : $1,038.77 <br />MATERIAL QUANTITIES <br />Selected estimating method <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 20.00 acres Rip depth (ft) : 2.50 Volume : 80,667 BCY or CCY <br />Source of estimated quantity :Appendix A Table 1.4-5 <br />Source of estimated load factor : NA <br /> .. ----._ <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feettsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 4,060.03 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.50 <br />- feet/pass Site altitude : 6,400 feet <br />Average ripping width : 8.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 1.007 acres/hour Adjusted unit production : 3,369.82 cu. yds./hour <br />Unadjusted production : 4,060.03 cu. yds./hour Adjusted fleet production : 13,479.28 cu. yds./hour <br /> <br />. <br />JOB TIME AND COST _ <br />Fleet size : 4 dozer(s) Total job time : 5.98 hours <br />Unit cost : $0.077 per cu. yd. Total job cost : $6,216 <br />Area <br />r-
The URL can be used to link to this page
Your browser does not support the video tag.