Laserfiche WebLink
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task #: 005 State : Colorado Permit/job# : C:-1981-010 <br />Date : 0310312010 County:Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C,010-005 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description :DIE Pit Regrade (West) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.74 NA <br /> Operating cost/hour : $209.76 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.79 NA <br /> Total unit cost/hour : $334.29 Total fleet cost/hour : $2,005.72 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 521,710 LCY factor : NA volume : 521,710 LCY <br />Source of estimated volume : Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 357 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 856.8 LCY/hr Dozing method : 1.17 (user) <br /> Visibility: 0.90 (user) <br />Material consistency description : Job efficiency : 0.79 (3shifts /day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2475 Ibs/LCY Net correction : 0.69 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 590.82 LCY/hr <br /> Adjusted fleet production : 3,544.90 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 6 Dozer(s) Total job time : 147.17 Hours <br />Unit cost : $0.566 /LCY Total job cost : $295,186 <br />Horsepower: 850 <br />Shift basis : 3 per day