My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-06-04_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:49 PM
Creation date
6/4/2010 9:52:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
6/4/2010
Doc Name
Midterm Review Findings Document
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT6
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado Permit/job# :C-1981-010 <br />Date : 0310312010 County : Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C:010-002 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description :Ash Disposal Pit Regrade (North) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.74 NA <br />Operating cost/hour : $209.76 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.79 NA <br />Total unit cost/hour : $334.29 Total fleet cost/hour : $1,337.15 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 209,795 LCY factor : NA volume : 209,795 LCY <br />Source of estimated volume :Permit Appendix A, Table 1.4-2 _ <br />Source of estimated swell factor : Cat <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance : 264 feet <br />Unadjusted hourly production : 1,157.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (? <br />Average site altitude : 6,800 feet <br />Material weight:_ <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size <br />Unit cost : <br />Operator skill <br />Material consistency <br />Dozing method : <br />Visibility: _ <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />2475 Ibs/LCY <br />Net correction : <br />Horsepower: 850 <br />Shift basis : 3 per day <br />Source <br />0.80 (user) <br />1.00 <br />1.17 <br />0.90 <br />0.79 <br />1.00 <br />1.11 <br />1.00 <br />0.93 <br />1.00 <br />0.69 <br />(doz-oc) <br />(Cat HB) <br />Adjusted unit production <br />Adjusted fleet production <br />4 Dozer(s) <br />$0.419 /LCY <br />798.37 LCY/hr <br />3,193.50 LCY/hr <br />Total job time : 65.69 <br />Total job cost : $87,843 <br />Hours
The URL can be used to link to this page
Your browser does not support the video tag.