Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />7, _ . <br />PROJECT IDENTIFICATION <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Task #: 081 State : Colorado Permit/job #: C2009 - 087 <br />Date : 0410812010 County : Routt Abbreviation : none <br />User: JHB Site Peabody Sage Creek Mine Filename: C087 -081 <br />Permit or other job action : New application <br />Task description: Clean sediment form LCSS & UCSS & dispose @ refuse pile <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Enuinment Description <br />Truck/loader team -Truck <br />- Loader : <br />Generic 10 -12 cy, 6x4 <br />CAT 973C <br />Support equipment -Load area :NA <br />-Dump area <br />NA <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />NA <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />trakload <br />NA <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />100 <br />19 <br />NA <br />NA <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$13.34 <br />$54.21 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$38.89 <br />$11.25 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units : <br />$74.51 <br />$104.00 <br />NA <br />NA <br />NA <br />NA <br />6 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group subtotals :1 <br />Work : $551.06 <br />Support : $0.00 <br />Maintenance: $0.00 <br />Total work team cost/hour: $551.06 <br />....... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 5,485 CCY factor : 1.090 volume: 5,979 LCY <br />Source of quantity take -off : PAP p. 2.05 -27 <br />Source of estimated swell factor : Caterpillar Handbook 40th edition <br />Material purchase cost: $0.00 /LCY Total cost : $0 <br />_ <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: Truck Bed (volume) Basis: <br />Material weight: 2,600 pounds /LCY Struck volume : <br />Descr.: Clay and gravel - Wet Heaped volume: <br />Rated payload <br />Payload capacity <br />35,400 pounds Average volume: <br />13.62 LCY Adjusted volume *: <br />Final truck volume based on number of loader passes : <br />10.00 <br />7z.uu <br />11.00 <br />12.00 <br />8.25 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />* truck volume adjusted to not exceed rated payload or heaped volume <br />Loadina Tool Capacity: <br />Job Condition Corrections: <br />Site altitude (ft.) :6,650 <br />Rated capacity (nom. heaped) : <br />3.750 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Other - rock/dirt mixtures <br />(100 -120 %) <br />Altitude adj.: <br />1.000 <br />1.000 <br />(Cat HB) <br />Bucket fill factor: <br />1.100 <br />Job efficiency: <br />0.830 <br />0.830 <br />(1 shift/day) <br />Adjusted bucket capacity : <br />4.125 LCY <br />Net correction : <br />0.830 <br />0.830 <br />