My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # 079 <br />Date 0410812010 <br />User: JH8 <br />State : Colorado <br />County :Routt <br />Site Peabody Sage Creek Mine <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description Backrill UCSS sump <br />... .... . _�-- <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat DIOR - 10SU (2005) Horsepower: 570 <br />Blade type Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis :_ 1 per day <br />Attachment no. 2 :3-shank ripper <br />Permit/job#: C2009 <br />Abbreviation : none <br />Filename :CO87-079 <br />Data source <br />:_ (CRG) <br />Utilization % <br />Cost Breakdown <br />Ownership cost/hour: <br />$89.77 <br />NA <br />Operating cost/hour: <br />$128.30 <br />100 <br />Ripper op. cost/hour: <br />$1.48 <br />15 <br />Operator cost/hour: <br />$38.54 <br />NA <br />. ... ...... . ....... . . . <br />Total unit cost/hour: <br />$258.08 Total fleet cost/hour: <br />$258.08 <br />..... ... . . ..... . . .... ....... <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 1,389 <br />CCY factor <br />1.125 volume <br />1,563 <br />LCY <br />Source of estimated volume: Map 2.05.3 M1 2.05.3-E2.e <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance <br />200 feet <br />Material consistency: <br />0.90 <br />(Cat HB) <br />Unadjusted hourly production <br />946.0 LCY/hr <br />Dozing method <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description <br />Job efficiency: <br />0.83 <br />(1 shift1day) <br />Compacted fill or embankment <br />Spoil pile: <br />0.80 <br />ffnd-ro <br />Push gradient: <br />1.00 <br />(Cat HB) <br />Average push gradient: <br />0.00 % (Pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude <br />6,650 feet <br />Material weight: <br />0.87 <br />HB) <br />Blade type <br />1.00 <br />— (Cat <br />(S/SU/Q) <br />Material weight: <br />2,650 Ibs/LCY <br />Net correction <br />0.39 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production <br />367.86 <br />LCY/hr <br />Adjusted fleet production <br />367.86 <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size <br />I Dozer(s) <br />Total job time <br />4.25 <br />Hours <br />Unit cost <br />$0.702 /LCY <br />Total job cost: <br />$1,096 <br />Permit/job#: C2009 <br />Abbreviation : none <br />Filename :CO87-079 <br />
The URL can be used to link to this page
Your browser does not support the video tag.