CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 072 State : Colorado Permit/job #: C2009 -087 <br />Date : 0311712010 County : Routt Abbreviation : none <br />User: JHB Site Peabody Sage Creek Mine Filename : C87 -072 <br />Permit or other job action : New application <br />Task description: Remove grave% from 0.3 acre North Office Parking Lot <br />.. _ <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />lEouioment Description <br />Truck/loader team -Truck <br />-Loader: <br />Cat 771D <br />CAT 988G (2005) <br />Support equipment -Load area : <br />-Dump area: <br />NA <br />NA <br />Road maintenance -Motor grader <br />-Water truck : <br />CAT 14H <br />Water Tanker, 10,000 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />grader <br />misctruk <br />% Utilization-machine: <br />100 <br />87 <br />NA <br />NA <br />25 <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />NA <br />0 <br />NA <br />Ownership cost/hour : <br />$43.31 <br />$62.60 <br />NA <br />NA <br />$41.79 <br />$62.58 <br />Operating cost/hour : <br />$64.93 <br />$66.35 <br />NA <br />NA <br />$11.56 <br />$21.28 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.29 <br />$38.72 <br />NA <br />NA <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$130.53 <br />$167.67 <br />NA <br />NA <br />$77.85 <br />$122.56 <br />6 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group subtotals :1 <br />Work : $950.85 <br />Support : $0.00 <br />maintenance: $200.41 <br />Total work team cost/h $1,151.26 <br />...:. .... ., w. .... :........ . �m <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 484 CCY factor : 1.090 volume: 528 LCY <br />Source of quantity take -off : Map 2.05.3 M1B <br />Source of estimated swell factor : Caterpillar Handbook 40th edition <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: Truck Bed (volume) Basis: <br />Material weight: <br />Descr.: Clay and gravel - Dry <br />2,400 pounds /LCY <br />Struck volume : <br />Heaped volume: <br />Average volume: <br />26.40 <br />36.00 <br />31.20 <br />LCY <br />LCY <br />LCY <br />Rated payload: 92,900 pounds <br />Payload capacity : <br />38.71 LCY <br />Adjusted volume': <br />36.00 <br />LCY <br />Final truck volume based <br />on number of loader passes : <br />27.06 <br />LCY <br />truck volume adjusted to not exceed <br />rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections: <br />Site altitude (ft.): 6,625 <br />Rated capacity (nom. heaped) : <br />8.200 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Other - rock1birt mixtures <br />(100 -120%) <br />Altitude adj.: 1.000 <br />1.000 <br />(Cat HB) <br />Bucket fill factor : <br />1.100 <br />Job efficiency: 0.830 <br />0.830 <br />(1 shift/day) <br />Adjusted bucket capacity : <br />9.020 LCY <br />Net correction : 0.830 <br />0.830 <br />