Laserfiche WebLink
Task 069 Rill and Gully /road repair over 10 year liability <br />based on SII SI-4 task 087 <br />JHB 4/15/2010 Peabody Sage Creek Mine C2009 -087 <br />assume 40 hrs /year, plus 4 hrs. mob /demob from Hayden, 10 -year liability period <br />Caterpillar 14H hours cost /hr cost <br />mob /demob 40 $ 166.32 $ 6,652.80 <br />grading 400 $ 166.32 $ 66,528.00 <br />$ 73,180.80 <br />2010 RS Means 02 91 10 <br />