Truck/Loader Team Work cont'd Task #: 065 sheet 2 of 2 <br />z <br />Loading Tool Cycle Time: Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels - machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load <br />NA Maneuver: NA Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml 0.600 minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material : <br />Mixed material <br />0.020 <br />(Cat HB) <br />Stockpile : <br />No adjustment - factor not applicable <br />0.000 <br />(Cat HB) <br />Truck ownership : <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Operation : <br />Constant operation <br />-0.040 <br />(Cat HB) <br />Dump target : <br />Nominal target <br />0.000 <br />(Cat HB) <br />Road <br />segment # <br />Net cycle time adjustment: <br />-0.060 <br />minutes <br />Total <br />resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) : <br />0.540 <br />minutes <br />2 <br />Net load time per truck * : <br />1.180 <br />minutes <br />Truck Cycle Time : <br />*bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />trucks <br />Truck exchange time * *: <br />0.65 minutes........ Adjusted for site altitude : <br />0.650 <br />minutes <br />Truck load time: <br />1.180 minutes........ Adjusted for site altitude : <br />1.180 <br />minutes <br />Truck maneuver and dump time: <br />1.05 minutes........ Adjusted for site altitude : <br />1.050 <br />minutes <br />— set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />LCY /hr <br />Truck travel (haul & return) time: <br />Road condition : -user <br />JOB TIME AND COST <br />Haul route : <br />Road <br />segment # <br />Haul distance <br />(miles) <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />(miles/hour) <br />Travel time <br />(minutes) <br />1 <br />2 <br />NA -user <br />NA -user <br />NA -user <br />30 <br />4.260 <br />trucks <br />Adjusted hourly truck team production : <br />709.26 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />709.26 <br />LCY /hr <br />Adjusted <br />hourly multiple truck/loader team produ : <br />709.26 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 <br />Team(s) Total job time: <br />6.45 <br />Hours <br />Unit cost: <br />$1.633 <br />/LCY Total job cost : <br />$7,468 <br />N , <br />.. <br />minutes <br />" travel time shown for each segment includes acceleration /deceleration adjustment Return time * *: 4.260 minutes <br />total haul and return time shown includes altitude adjustment Total truck cycle time : 11.400 minutes <br />Loading tool unit production : <br />887.21 <br />LCY /hour...... Adjusted for job efficiency : <br />736.39 <br />LCY /hour <br />Truck unit production : <br />142.42 <br />LCY /hour...... Adjusted for job efficiency : <br />118.21 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />6 <br />trucks........... Selected no. trucks /loader : <br />6 <br />trucks <br />Adjusted hourly truck team production : <br />709.26 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />709.26 <br />LCY /hr <br />Adjusted <br />hourly multiple truck/loader team produ : <br />709.26 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 <br />Team(s) Total job time: <br />6.45 <br />Hours <br />Unit cost: <br />$1.633 <br />/LCY Total job cost : <br />$7,468 <br />N , <br />.. <br />Return route : Haul time ** : 4.260 <br />