Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name Division Of Reclamation, Mining <br />Task # : 061 State : Colorado <br />Date : 0311612010 County : Routt <br />User: JHB Site Peabody Sage Creek Mine <br />HOURLY EQUIPMENT COST <br />Scraper work team - Scraper <br />-Push dozer <br />Permit or other job action : New Application <br />Task description :Replace topsoil on 5.04 ac. South Facilities storage area <br />Support equipment -Load area <br />- Dump area <br />Cost Bre <br />uipment Description <br />t 637G w /push pull <br />T 14H <br />Ater Tan ker, 10,000 Gal. <br />And Safety <br />Permit/job #: C2OO9 -087 <br />Abbreviation : none <br />Filename : C087 -061 <br />Shift basis: 1 per day <br />Road maintenance -Motor grader <br />-Water truck <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />scraper2 <br />NA <br />NA <br />NA <br />grader <br />misctruk <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />NA <br />NA <br />NA <br />NA <br />0 <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />NA <br />NA <br />$41.79 <br />$62.58 <br />$163.34 <br />NA <br />NA <br />NA <br />$11.56 <br />$21.28 <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$24.98 <br />NA <br />NA <br />NA <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$298.21 <br />NA <br />NA <br />NA <br />$77.85 <br />$122.56 <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group subtotals : <br />Work: $596.43 <br />Support : $0.00 1 <br />Maintenance : $200.41 <br />Total work team cost/hour : $ 796.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,131 CCY factor : 1.102 volume: 8,961 LCY <br />Source of quantity take -off : Map 2.05.3 MIA, 5.04 ac. x 12" th. <br />Source of estimated swell factor: Seneca li SL3 RCE <br />