Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />057 State : Colorado Permit/job #: C2009 -087 <br />0311612010 County : Routt Abbreviation : none <br />JHB Site Peabodv Saw Creek Mine Filename :C087 -057 <br />Permit or other job action : New Application <br />Task description :replace topsoil On Coal Handling facilities area <br />HOURLY EQUIPMENT COST <br />Description <br />Cost Bre <br />Shift basis: 1 per day <br />Scraper work team - Scraper : Cat 637G w /push -pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck :I Water Tanker, 10,000 Gal. <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />scraper2 <br />NA - <br />NA <br />NA <br />grader <br />misctruk <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />NA <br />NA <br />NA <br />NA <br />0 <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />NA <br />NA <br />$41.79 <br />$62.58 <br />$163.34 <br />NA <br />NA <br />NA <br />$11.56 <br />$21.28 <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$24.98 <br />NA <br />NA <br />NA <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$298.21 <br />NA <br />NA <br />NA <br />$77.85 <br />$122.56 <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group subtotals : <br />Work: $596.43 <br />Support : $0.00 <br />Mainten : $200.41 <br />Total work team cost/hour : $ 796.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 11,842 CCY factor : 1.102 volume: 13,056 LCY <br />Source of quantity take -off : Map 2.05.3 M1A, 7.34 ac. X 12" th. <br />Source of estimated swell factor Seneca // SL3 RCE <br />